PLC & SCADA Design

PLC and SCADA specialists.

Case Study - PLC  and SCADA Software Engineering

portfolio1 portfolio2 portfolio3 portfolio4 portfolio5 portfolio6 portfolio7

Waste water treatment.

Design and implementation of waste water treatment  processes.

Mechanical electrical controls, system installation and commissioning.

Process control and monitoring instrumentation.

Control system and SCADA software development.

Planned and reactive maintenance.

Clean Water treatment.

Design and implementation of clean water treatment  processes.

Mechanical electrical controls system installation and commissioning.

Process control and monitoring instrumentation.

Control system and SCADA software development.

Planned and reactive maintenance.

Mechanical Installations.

Supply and installation of pumped systems on both clean and waste water environments within the Utility Industries.

Pumped systems installed and commissioned across a range of process industries.

Electrical Installations.

Design and build of control panels and electrical systems.

Supply and installation of process instrumentation.

Testing and commissioning of electrical control systems.

SCADA  control systems.

Development and implementation of SCADA based control systems.

Software development for PLC’s across a range of manufacturers.

Testing commissioning and ongoing support.

Fibre-optic Networks.

Design and installation of fibre optic networks, including the supply of panels .

Maintenance.

Planned and reactive maintenance of single and multi-site plant systems.

Mechanical Electrical systems software support.

waste water control engineering switchgear panel builders clean water resrvoir telemetry electrical circuit designers industrial water pump and pipework installers SCADA systems installers fibre optic telemetry specialists electrical installation commissioning water treatment pump maintenance industrial control maintenance for the utilties
themed object
Electrical, Mechanical & Control Instrumentation Specialists.

  • NICEIC Approved Electrical Contractors.
  • FIA Accredited fibre optics installer.
  • ISO9001 Quality Assurance certified and approved organisation.
  • OHSAS18001 Health and Safety assured and certified company.
  • Achilles Verify 5 approved company.
  • ISO14001 Environmental Management systems approval.
get in touch

 



Case Study

Basic Data

1.Project title

 Engineering Services Framework

2.Services Provided

PLC  and SCADA Software Engineering

3.Type of work 

         PLC programming

4.Type of client  (i.e. government department, housing association, developer)

Utility

5.Project Location

Various sites throughout North West England

6.Project value

Framework against agreed rates

7.Project start/end date

September 2009 – January 2011

8.         Project Details

Software Engineers based at Ramptec premises, Warrington carrying out PLC and SCADA software modification on various United Utilities sites to enable the upgrade of site PLC systems providing signals for the Real Time Dashboard (RTD) project.

This involved interfacing to existing PLC’s, modifying PLC software, troubleshooting and rectifying failing systems, interfacing to CHP systems to gather PPC data from Jenbacher DIANE and CompAp Intelisys controllers, interrogating existing PLC / SCADA systems.

The project involved programming of the following PLC systems and software packages: Siemens S7 ( Simatic manager), Allen Bradley (RS Logix 500), Siemens TI505 ( Softshop), Sattcon (DOX 5) and Gem 80 (Gemsys).

The following HMI / SCADA  packages were also used Siemens WINCC and FLEX, Siemens Protocol, RS View and Panelbuilder.

 

Essential Case Study Components

Key Project Principles/Objectives

  • Provision of specialist Engineering services   
    • Project continuity
    • Seamless transition from UU in house project team to Ramptec project team
    • Production of complete project documentation packages
    •  

Key Challenges

 

Planning:  The work packages were fragmented with delays as a result. The impact of this was minimised by greater monitoring of resource allocation and liaison in advance with the client.

 

Other Issues: Allocation and retention of specialist resources. This was addressed by providing continuity on the project and full utilisation of resources.

 

Successful Outcomes/ Project Highlights:

  • All software completed with minimum operational disruptions

 

Key  targets and project measures - comparative to industry standard (e.g. KPIs):

  • In addition, the project was completed

 

  • On budget
  • With zero accidents on site
  • With zero defects at handover
  • Information available on programme.

 

Project Highlights

  • Successful interfacing with on site systems
  • Availability of enhanced information.

 

 

 

slide up button

 National Inspection Council for Electrical Installation approved contractorspacerquality management assured contractorsspacerenvironmental management accredited companyspacerachilles verified and accredited organisationspacerFibre optics approved installlerspaceroccupational health and safety management approved organisation