Case Study |
|
Basic Data |
|
1.Project title |
Pembroke AGI |
2.Services Provided |
The manufacture, testing and installation of telemetry panels on National Grid (Gas) AGI's |
3.Type of work |
Electrical and control engineering, panel manufacture, testing, site installation and commissioning. |
4.Type of client (i.e. government department, housing association, developer) |
Utilities – Gas |
5.Project Location |
Pembroke, South wales |
6.Project value |
120,000 |
7.Project start/end date |
July 2010 to Feb 2011 |
8. Project Details |
|
The project involved the manufacture of instrument telemetry panels, installed in GRP kiosk fitted on two off AGI’s. The telemetry equipment was installed to provide data between the two sites and the clients control room This equipment was then installed and commissioned on site. The panels were fitted into the kiosks at Ramptec’s workshop in Warrington, tested and then shipped to site. The panels were manufactured to clients design documentation |
|
Essential Case Study Components |
|
Key Project Principles/Objectives
|
|
Key Challenges Planning: Ramptec’s input was part of a larger project, we had to ensure that or equipment was manufactured, installed and commissioned to the agreed programme. Our site installation of the equipment had to be coordinated with other trades. Budget: The equipment supplied was specified by the client and purchased by ourselves. To ensure that agreed costs were adhered to we had to work closely with our client during the procurement stage negotiations with our suppliers. Time: The long lead time of some equipment extended the project programme, however this was minimised by working closely with our suppliers to identify long delivery equipment which was ordered early on in the procurement phase of the project. |
|
Successful Outcomes/ Project Highlights:
|
|
Key targets and project measures - comparative to industry standard (e.g. KPIs):
|
|
Project Highlights
|