Telemetry Systems

Telemetry Installation Engineering

Case Study - The  manufacture, testing and installation of telemetry panels on National Grid (Gas) AGI's

portfolio1 portfolio2 portfolio3 portfolio4 portfolio5 portfolio6 portfolio7

Waste water treatment.

Design and implementation of waste water treatment  processes.

Mechanical electrical controls, system installation and commissioning.

Process control and monitoring instrumentation.

Control system and SCADA software development.

Planned and reactive maintenance.

Clean Water treatment.

Design and implementation of clean water treatment  processes.

Mechanical electrical controls system installation and commissioning.

Process control and monitoring instrumentation.

Control system and SCADA software development.

Planned and reactive maintenance.

Mechanical Installations.

Supply and installation of pumped systems on both clean and waste water environments within the Utility Industries.

Pumped systems installed and commissioned across a range of process industries.

Electrical Installations.

Design and build of control panels and electrical systems.

Supply and installation of process instrumentation.

Testing and commissioning of electrical control systems.

SCADA  control systems.

Development and implementation of SCADA based control systems.

Software development for PLC’s across a range of manufacturers.

Testing commissioning and ongoing support.

Fibre-optic Networks.

Design and installation of fibre optic networks, including the supply of panels .

Maintenance.

Planned and reactive maintenance of single and multi-site plant systems.

Mechanical Electrical systems software support.

waste water control engineering switchgear panel builders clean water resrvoir telemetry electrical circuit designers industrial water pump and pipework installers SCADA systems installers fibre optic telemetry specialists electrical installation commissioning water treatment pump maintenance industrial control maintenance for the utilties
themed object
Electrical, Mechanical & Control Instrumentation Specialists.

  • NICEIC Approved Electrical Contractors.
  • FIA Accredited fibre optics installer.
  • ISO9001 Quality Assurance certified and approved organisation.
  • OHSAS18001 Health and Safety assured and certified company.
  • Achilles Verify 5 approved company.
  • ISO14001 Environmental Management systems approval.
get in touch

 


Case Study

Basic Data

1.Project title

Pembroke AGI

2.Services Provided

The  manufacture, testing and installation of telemetry panels on National Grid (Gas) AGI's

3.Type of work 

Electrical and control engineering, panel manufacture, testing, site installation and commissioning.

4.Type of client  (i.e. government department, housing association, developer)

Utilities – Gas

5.Project Location

Pembroke, South wales

6.Project value

£120,000

7.Project start/end date

July 2010 – Feb 2011

8.         Project Details

The project involved the manufacture of instrument telemetry panels, installed in GRP kiosk fitted on two off AGI’s. The telemetry equipment was installed to provide data between the two sites and the clients control room This equipment was then installed and commissioned on site.

The panels were fitted into the kiosks at Ramptec’s workshop in Warrington, tested and then shipped to site.

The panels were manufactured to clients design documentation

Essential Case Study Components

Key Project Principles/Objectives

  • To ensure the equipment was fully tested prior to installation
  • Working closely with the client to interface to existing site systems.
    • To deliver the project within agreed timescales, and on budget

 

Key Challenges

Planning:  Ramptec’s input was part of a larger project, we had to ensure that or equipment was manufactured, installed and commissioned to the agreed programme. Our site installation of the equipment had to be coordinated with other trades.

Budget:  The equipment supplied was specified by the client and purchased by ourselves. To ensure that agreed costs were adhered to we had to work closely with our client during the procurement stage negotiations with our suppliers.

Time: The long lead time of some equipment extended the project programme, however this was minimised by working closely with our suppliers to identify long delivery equipment which was ordered early on in the procurement phase of the project.

 

 

 

Successful Outcomes/ Project Highlights:

  • Minimum downtime of operational systems during site interface.
  • Panel testing reduced issues on site
  • Pre-installation meetings with clients to plan site installations

Key  targets and project measures - comparative to industry standard (e.g. KPIs):

  • In addition, the project was completed

 

  • On budget
  • With zero accidents on site
  • Increased functionality of controls

 

Project Highlights

  • Successful site commissioning due to earlier panel tests.

 

slide up button

 National Inspection Council for Electrical Installation approved contractorspacerquality management assured contractorsspacerenvironmental management accredited companyspacerachilles verified and accredited organisationspacerFibre optics approved installlerspaceroccupational health and safety management approved organisation